云南水力发电2024,Vol.40Issue(4):172-175,4.DOI:10.3969/j.issn.1006-3951.2024.04.042
东莞市三坑水库枢纽工程安全评价分析及处理建议
Safety Evaluation Analysis and Treatment Suggestions for Sankeng Reservoir Hub Project in Dongguan
罗小林1
作者信息
- 1. 东莞市水利勘测设计院有限公司,广东 东莞 523000
- 折叠
摘要
Abstract
The reliability of the operation of the reservoir hub project is directly related to issues such as flood control in the basin and regional water supply safety.The Sankeng Reservoir Hub Project in Dongguan City consists of three parts:a dam,a spillway,and a water conveyance culvert.After years of operation,there are certain risks and hazards.It is necessary to carry out safety evaluation work to ensure the stable play of flood control and profit benefits in hub projects.The performance of each sub item of Sankeng Reservoir is reviewed and evaluated,and the final evaluation of the dam's safety is classified as a Class II dam.Based on the safety evaluation,relevant handling measures and suggestions have been proposed for the competent department to adopt and make decisions.关键词
水库枢纽工程/大坝/溢洪道/安全评价Key words
reservoir hub engineering/dam/spillway/safety evaluation分类
建筑与水利引用本文复制引用
罗小林..东莞市三坑水库枢纽工程安全评价分析及处理建议[J].云南水力发电,2024,40(4):172-175,4.