云南水力发电2024,Vol.40Issue(4):184-187,4.DOI:10.3969/j.issn.1006-3951.2024.04.045
小型土石坝水库除险加固及渗流安全稳定评价
Reinforcement and Seepage Safety and Stability Evaluation of Small Earth Rock Dam Reservoir
钟琦1
作者信息
- 1. 阳春市水利水电勘测设计室,广东 阳春 529600
- 折叠
摘要
Abstract
The reinforcement of water conservancy is crucial for the safe operation of many dangerous reservoirs constructed in the early stages.Shabiao North Reservoir was built early,and the engineering geological conditions that affect the safety and stability of the reservoir are complex.At the same time,there are safety and stability hazards in the dam body,including seepage safety hazards.Taking Shabiao North Reservoir as the research background,this paper proposes a systematic reinforcement plan from the aspects of dam crest reinforcement,anti-seepage reinforcement,and dam slope reinforcement.A review analysis is conducted on the seepage and safety stability of the dam,and reasonable monitoring and supplementary measures are proposed.关键词
土石坝/除险加固/渗流安全/稳定性复核Key words
earth-rock dam/reinforcement/seepage safety/stability review分类
建筑与水利引用本文复制引用
钟琦..小型土石坝水库除险加固及渗流安全稳定评价[J].云南水力发电,2024,40(4):184-187,4.