地质装备2024,Vol.25Issue(2):34-38,5.
浅析岩溶发育区铁路隧道溶洞处理技术
Analysis on the cave treatment technologies of railway tunnel in karst development areas
王献伟1
作者信息
- 1. 中铁建城市建设投资有限公司,南京 210000
- 折叠
摘要
Abstract
It is inevitable to encounter karst problems during tunnel construction.To solve the technical difficulties encountered during tunnelling through karst caves and ensure safe and effective tunnel construction,it is necessary to detect and study the surrounding rock of tunnels in karst areas.This paper puts forward tunnel cave treatment technologies such as long hole ad-vanced drilling,accurate measurement,hydrogeology analysis based on typical construction sites and the characteristics of spe-cific karst caves,which effectively ensure the safe treatment of karst caves and tunnel construction and can also provide certain reference value for future research.关键词
高山隧道/超前钻探/精确测量/水文地质Key words
alpine tunnel/advanced drilling/accurate measurement/hydrogeology分类
交通工程引用本文复制引用
王献伟..浅析岩溶发育区铁路隧道溶洞处理技术[J].地质装备,2024,25(2):34-38,5.