扭王块安装的传统工艺与可视化系统工艺对比研究

朱昊君

港口航道与近海工程2024,Vol.61Issue(2):104-107,4.
港口航道与近海工程2024,Vol.61Issue(2):104-107,4.DOI:10.16403/j.cnki.ggjs20240222

扭王块安装的传统工艺与可视化系统工艺对比研究

Comparative Analysis of Traditional Technology and Visual-System Technology Adopted in Installation of Accropodes

朱昊君1

作者信息

  • 1. 中国港湾工程有限责任公司,北京 100027
  • 折叠

摘要

Abstract

In order to improve the construction technology of the breakwater with CLI Accropode armor structure,including the efficiency and quality of accropode installation,Skikda LNG Port reconstruction in Algeria and Tema container terminal in Ghana are selected to study the standard,inspection requirements and process of CLI accropode installation,analyze the traditional technology,as well as the technology assisted by Echoscope 3D sonar imaging visual system developed by Coda Octopus company in Britain.The above underwater installation processes are compared from the aspects of operable time,efficiency,safety level,economy,quality and accuracy.The research will provide a guideline for similar projects.

关键词

扭王块/CLI专利/传统模式/3D可视化系统/对比分析

Key words

accropode/CLI patent/traditional mode/3D visual system/comparative analysis