桂江已建水利工程生态流量核定与保障先行先试工作探讨OA
Ecological flow verification and guarantee trial work for the built hydraulic projects on Guijiang River
为推进生态文明建设,推动新阶段水利高质量发展,水利部组织开展已建水利水电工程生态流量核定与保障先行先试工作.广西桂江选取斧子口、京南、川江、小溶江水利枢纽和青狮潭水库作为先行先试工程,本文介绍了核定工程生态流量的原则方法和结果,并提出完善生态流量保障措施,为后续全面推进已建工程生态流量核定提供经验.
In order to promote ecological civilization construction and high-quality development of water conservan-cy at new stage,the Ministry of Water Resources organizes the ecological flow verification and guarantee trial work for the built hydraulic projects.Five hydraulic projects of Fuzikou,Jingnan,Chuanjiang,Xiaorongjiang and Qingshi-tan Reservoir located on Guijiang River in Guangxi are selected as the trial projects.An introduction was made on the principle,method and results of ecological flow verification,and ecological flow guarantee measures were put forward,so as to provide experience for the subsequent comprehensive promotion of ecological flow management of built projects.
雷丹妮;蒋婷
广西水利电力勘测设计研究院有限责任公司,南宁 530023
水利科学
生态流量核定方法保障措施先行先试桂江
ecological flowverification methodguarantee measurestrial workGuijiang River
《广西水利水电》 2024 (002)
35-39 / 5
评论