核安全2024,Vol.23Issue(2):37-44,8.
海地瓜聚集行为对核电厂冷源的风险分析
Risk Analysis of the Aggregation Behavior of Acaudina Molpadioides on Nuclear Power Plant Cold Source
摘要
Abstract
In Middle-late May,reproductive parents reach the peak of breeding season in the northern coast of Fujian.Juveniles survive on the shallow surface of sediment in mid June,and can be resuspended into water bodies before mid September due to typhoon agitation.Due to strong reproductive capacity and two regional redistribution stages in the floating stage of larval and the re-suspension stage of juvenile,a high concentration area of A.molpadioides can be formed in nuclear power intake area under the action of water intaking.With the exponential growth of A.molpadioides,a large number of disaster causing juveniles can form between July and September,which are suspended in the water under the action of typhoons and other factors,and gather in the drum filter under the action of water intake,causing disasters.Therefore risk assessment and prevention measures for the aggregation of A.molpadioides should be carried out for the construction of nuclear power plants in suitable growing environment.关键词
福建北部海域/海地瓜/风险/生存方式/生活史/台风/再悬浮Key words
north coast of Fujian/Acaudina molpadioides/risk/survival modes/life history/typhoon/re-suspension分类
生物科学引用本文复制引用
鲁超,郭玉臣,刘炜,郑碧琪,黄清泽,王恒,程宏,郇凤..海地瓜聚集行为对核电厂冷源的风险分析[J].核安全,2024,23(2):37-44,8.基金项目
自然资源部东海局青年科技基金,项目编号:202113 ()
项目名称:福建省科技厅自然科学基金,项目编号:2022J05267 ()
项目名称:宁德师范学院引进人才科研启动项目,项目编号:2019Y02 ()
项目名称:自然资源部海洋生态监测与修复技术重点实验室开放研究基金,项目编号:MEMRT202206 ()