煤炭与化工2024,Vol.47Issue(3):7-10,4.DOI:10.19286/j.cnki.cci.2024.03.002
充填支柱在大采高工作面过空巷支护中的应用
Application of filling pillar in crossing abandoned roadway support in large mining height working face
孙侯明1
作者信息
- 1. 晋能控股装备制造集团长治仙泉煤业有限公司,山西长治 046000
- 折叠
摘要
Abstract
In order to solve the problem that there were a large number of empty roadways in No.15105 Face of Xianquan Coal Industry in Changzhi,which may lead to roof accidents caused by strong dynamic load during the mining process,FLAC3D numerical simulation software was used to calculate the advance support stress during the working face near the abandoned roadways,and the filling pillar parameters were designed according to this.The same material was used to obtain different compressive strength supports,which met the different structural requirements of filling pillars.The practice proved that after the filling pillar was used to support the open roadway of the working face,there was no large-scale sheet wall,roof collapse and support crushing in the process of mining,and the working face passed through the open roadway smoothly.关键词
充填支柱/大采高/数值模拟/过空巷Key words
filling pillar/large mining height/numerical simulation/crossing abandoned roadway分类
矿业与冶金引用本文复制引用
孙侯明..充填支柱在大采高工作面过空巷支护中的应用[J].煤炭与化工,2024,47(3):7-10,4.