BDa水电站泄洪雾化数学模型研究

鲍伟 王天宇 刘昉

海河水利Issue(4):87-90,95,5.
海河水利Issue(4):87-90,95,5.DOI:10.3969/j.issn.1004-7328.2024.04.021

BDa水电站泄洪雾化数学模型研究

Mathematical Model of Flood Discharge Atomization for BDa Hydropower Station

鲍伟 1王天宇 2刘昉2

作者信息

  • 1. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081
  • 2. 天津大学水利工程仿真与安全国家重点实验室,天津 300072
  • 折叠

摘要

Abstract

The flood discharge atomization caused by flip bucket may adversely affect the stability of slopes on both sides of the hydropower station,transportation safety and the safe operation of the power plant.The random spattering model is used to simulate the influence range and rainfall intensity distribution of three typical discharge conditions of the BDa hydropower station under two situations of both no natural wind and the most unfavorable natural wind in flood season,caused by flood discharge atomization.The result shows that the misty rain caused by flood discharge atomization is greatly affected by terrain,with weak lateral diffusion and mainly climbing along slopes,and the contour lines of rainfall intensity are concentrated.The most unfavorable natural wind in flood season causes the misty rain influence range to shift towards the left bank and the influence of flood discharge atomization on the left bank is greater than that on the right bank.The range of violent rainfall caused by flood discharge atomization is concentrated in the downstream area of the dam axis from 195 to 645 meters,with a lateral elevation below 3017 meters for the left bank and 2988 meters for the right bank.

关键词

泄洪雾化/随机喷溅/降雨强度/防护措施

Key words

flood discharge atomization/random spattering/rainfall intensity/protective measure