高陂塘排涝渠高支模强度计算研究
Calculation on High Formwork Strength of Gaobeitang Drainage Channel
秦辉1
作者信息
- 1. 广东省水利水电第三工程局有限公司,广东 东莞 523000
- 折叠
摘要
Abstract
Due to the particularity of high-rise structures,conventional hydraulic engineering structures are difficult to guarantee their stability.High formwork not only effectively improves construction efficiency,but also enhances the safety factor during the construction process,which has obvious practical value for engineering construction.Taking the demolition and relocation project of the Gaobeitang drainage channel as an example,the design scheme of the top plate formwork,side wall formwork,and support system are elaborated in detail,and the plates,formwork,and support system in dangerous areas are verified.The research results can provide reference for related projects.关键词
水利工程/强度设计/高支模Key words
hydraulic engineering/strength design/high formwork分类
建筑与水利引用本文复制引用