| 注册
首页|期刊导航|海河水利|基于BIM的水利工程概算编制研究

基于BIM的水利工程概算编制研究

牛立军 陈慧萍

海河水利Issue(4):120-125,6.
海河水利Issue(4):120-125,6.DOI:10.3969/j.issn.1004-7328.2024.04.029

基于BIM的水利工程概算编制研究

Budget Estimate Compilation of Water Conservancy Project Based on BIM

牛立军 1陈慧萍1

作者信息

  • 1. 华北水利水电大学,河南 郑州 450046
  • 折叠

摘要

Abstract

Aiming at the problems of difficult information sharing,insufficient coordination,cumbersome calculation,and separation between quantity and price in the traditional water conservancy project budget preparation work,a BIM budget estimation workflow is proposed.Taking Visual Studio as the development environment,Revit is redeveloped based on the.NET framework,and a BIM-based water conservancy project budget preparation system is constructed.The system realizes a visual and interactive engineering budget preparation process,stores the engineering budget results in a three-dimensional model,and realizes the one-to-one correspondence between the model and the cost.The problems of missing items,wrong items and repeated measurement that often occur in the budget estimation of traditional water conservancy projects can effectively reduced using the BIM-based water conservancy project budget preparation system.By combining the results of engineering estimates with design results to form engineering digital assets,the effectiveness of engineering management can be effectively improved.

关键词

水利工程/工程概算编制/BIM/Revit二次开发/数字资产

Key words

water conservancy project/preparation of project budget estimates/BIM/Revit secondary development/digital assets

分类

建筑与水利

引用本文复制引用

牛立军,陈慧萍..基于BIM的水利工程概算编制研究[J].海河水利,2024,(4):120-125,6.

基金项目

国家重点研发计划(2022YFD1900402) (2022YFD1900402)

海河水利

1004-7328

访问量0
|
下载量0
段落导航相关论文