基于鱼骨图分析枯水期污水厂生产运行成本

王淑芳 梁倩莹 钟周昌

净水技术2024,Vol.43Issue(4):114-120,7.
净水技术2024,Vol.43Issue(4):114-120,7.DOI:10.15890/j.cnki.jsjs.2024.04.014

基于鱼骨图分析枯水期污水厂生产运行成本

Analysis of Production and Operation Costs of Wastewater Treatment Plants in Dry Season Based on Fishbone Diagram

王淑芳 1梁倩莹 2钟周昌2

作者信息

  • 1. 武汉理工大学资源与环境工程学院,湖北武汉 430070
  • 2. 东莞市水务集团净水有限公司,广东东莞 523000
  • 折叠

摘要

Abstract

This paper took Dongguan's wastewater treatment plants(WWTPs)during the dry season as the research object,and analyzed their inflow volume,water quality,and production and operation costs.Results showed that the average monthly load of 8 WWTPs in January was only 64.32%,of which 4 had a load below 60%;The inlet water quality could be good biochemical and met the requirements of biological phosphorus removal.However,only one WWTP had an influent BOD5/TN value greater than 4,indicating that most WWTPs were facing the problem of insufficient influent carbon source.In addition,the direct cost per ton of water(tap water fee,electricity fee,raw material drug consumption,and sludge disposal fee)of 8 WWTPs was relatively high,at 0.59 yuan/m3.Through the fish bone analysis method,it could be intuitively demonstrated that the main reasons for the cost increase of WWTPs in January were the increase in electricity consumption,carbon sources,phosphorus removal agents,and dry mud medicine consumption.In order to reduce the direct per ton water cost of WWTPs during the dry season,in response to the problems of high power consumption,large dosage of water treatment chemicals,and high consumption of dry sludge chemicals analyzed by the fishbone diagram,measures were proposed from the aspects of aeration,dosage,operation process,and equipment facilities,while ensuring the normal and stable operation of wastewater treatment facilities.It provides new ideas for energy saving and consumption reduction of other low load rate WWTPs.

关键词

污水处理厂/枯水期/鱼骨图/生产运行成本/节能降耗

Key words

wastewater treatment plant(WWTP)/dry season/fishbone diagram/production and operation costs/energy saving and consumption reduction