| 注册
首页|期刊导航|江西建材|跨运营铁路线盖梁施工技术及应用

跨运营铁路线盖梁施工技术及应用

辛永 杨海波 陈光远

江西建材Issue(2):268-271,4.
江西建材Issue(2):268-271,4.

跨运营铁路线盖梁施工技术及应用

Cross-operational Railway Line Cover Girder Construction Technology and Engineering Application

辛永 1杨海波 1陈光远1

作者信息

  • 1. 山东高速路桥国际工程有限公司,山东 济南 250014
  • 折叠

摘要

Abstract

In order to solve the technical problems of complex environmental construction difficulties such as crossing operating railway lines during bridge construction,this article takes the construction project of the elevated expressway at Dhaka Airport in Bangladesh as an example.In response to the problem of needing to ride existing operating railway lines for a long time,a new movable gantry auxiliary support system has been developed,successfully solving the problems of limited construction space and tight construction time for bridges crossing operating railway lines.

关键词

盖梁施工/可移动式门架系统/骑行运营铁路线

Key words

Cover girder construction/Movable gantry system/Ride-operated railroad line

分类

交通工程

引用本文复制引用

辛永,杨海波,陈光远..跨运营铁路线盖梁施工技术及应用[J].江西建材,2024,(2):268-271,4.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文