|国家科技期刊平台
首页|期刊导航|机械制造与自动化|弓网系统动态升弓问题关键影响因素研究

弓网系统动态升弓问题关键影响因素研究OACSTPCD

Research on Key Influence Factors of Dynamic Pantograph Lifting in Pantograph-catenary System

中文摘要英文摘要

以铁路车辆系统中弓网系统为研究对象,针对列车运行过程中不同供电制式(AC/DC)切换时产生的动态升降弓问题,建立弓网系统升降弓接触动力学模型,并结合升降弓地面试验验证该模型的准确性.基于弓网系统升降弓接触动力学模型,利用正交实验方法研究影响升弓动力学的关键因素以及考虑接触线拉出值条件下动力学性能变化规律,得到了弓网系统合理的升弓参数范围.结果表明:升弓条件下,影响弓网动力学关键因素为弓头质量、升弓速度和接触线拉出值位置.

Taking the pantograph-catenary system in railway vehicle system as the research object,and with the aim at the dynamic problem of pantograph lifting caused by AC/DC switching during train operation,this paper establishes a contact dynamic model of pantograph-catenary system,and verifies the accuracy of the model by ground test.Based on this model,the orthogonal experiment method is applied to explore the key factors affecting the dynamics of pantograph lifting and the regularity of the dynamic performance under the condition of stagger of contact wire,and reasonable parameters range of pantograph lifting in pantograph-catenary system is abtained.The results show that pantograph head quality,pantograph lifting speed and contact wire stagger position are the key factors affecting pantograph-catenary dynamics under pantograph lifting.

李牧迪;周宁;魏海飞;陈鸿明;程尧;张卫华

西南交通大学牵引动力国家重点试验室,四川成都 610031

交通运输

铁路车辆受电弓供电制式动态升弓接触线拉出值

railway vehiclepantographpower supply modedynamic pantograph liftingcontact wire stagger

《机械制造与自动化》 2024 (002)

209-213,270 / 6

国家自然科学基金项目(52072319);中国国家铁路集团有限公司科技研究开发计划项目(P2021J003,K2021J004-B);中铁二院工程集团有限责任公司科研项目(KSNQ2020056)

10.19344/j.cnki.issn1671-5276.2024.02.044

评论