| 注册
首页|期刊导航|科技创新与应用|某600MW机组主蒸汽管道热胀位移异常分析及处理

某600MW机组主蒸汽管道热胀位移异常分析及处理

王恒

科技创新与应用2024,Vol.14Issue(12):148-151,4.
科技创新与应用2024,Vol.14Issue(12):148-151,4.DOI:10.19981/j.CN23-1581/G3.2024.12.034

某600MW机组主蒸汽管道热胀位移异常分析及处理

王恒1

作者信息

  • 1. 贵州华电桐梓发电有限公司,贵州 桐梓 563200
  • 折叠

摘要

Abstract

In view of the abnormal thermal expansion displacement of the main steam pipe of a 600 MW unit,the load test method is used to obtain the actual lifting point load.It is found that the original hanger design load is less than the actual lifting point force of the pipeline and can not meet the load-bearing requirements of the pipeline,resulting in insufficient upward thermal expansion displacement of the pipeline.Finally,in line with the principle of economy and effectiveness,the fault is effectively solved by replacing a group of constant force hangers and changing the horizontal limit structure type,which effectively ensures the safe and stable operation of the pipeline,and also provides reference experience for the treatment of similar faults.

关键词

主蒸汽管道/热位移/恒力吊架/载荷测试/吊点载荷

Key words

main steam pipe/thermal displacement/constant force hanger/load test/suspension point load

分类

信息技术与安全科学

引用本文复制引用

王恒..某600MW机组主蒸汽管道热胀位移异常分析及处理[J].科技创新与应用,2024,14(12):148-151,4.

科技创新与应用

2095-2945

访问量0
|
下载量0
段落导航相关论文