四川水力发电2024,Vol.43Issue(2):6-13,8.
复杂地质条件下岩壁吊车梁破坏机理及长期稳定运行研究
Research on Failure Mechanism and Long-term Stable Operation of rock-bolted crane girder under Complex Geological Conditions
韩国君 1秦洋2
作者信息
- 1. 华电金沙江上游水电开发有限公司叶巴滩分公司,四川 甘孜 627153
- 2. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610072
- 折叠
摘要
Abstract
The underground caverns of Yebatan Hydropower Station are under joint adverse effect of extremely high stress and complex structural planes.In response to failure phenomenon of rock-bolted crane girder dur-ing the excavation,based on actual failure phenomena on site,microseismic monitoring data,geophysical de-tection and other results,failure mechanism of rock-bolted crane girder is analyzed in depth,and targeted dy-namic optimization design measures are proposed,simulation analysis software is used to calculate the opera-tional safety of the bridge crane under load.The results show that the addition of reinforced concrete buttress walls can meet the long-term safe operation of rock-bolted crane girder.关键词
复杂地质/岩壁吊车梁/破坏机理/稳定运行Key words
Complex geology/rock-bolted crane girder/Failure mechanism/Stable operation分类
水利科学引用本文复制引用
韩国君,秦洋..复杂地质条件下岩壁吊车梁破坏机理及长期稳定运行研究[J].四川水力发电,2024,43(2):6-13,8.