四川水力发电2024,Vol.43Issue(2):38-41,4.
EPC总承包模式下设计施工一体化相关问题探讨
Exploration on Integrated Design and Construction Issues under EPC General Contracting Mode
于晓飞 1王广巍 1张传航1
作者信息
- 1. 中国电建集团成都勘测设计研究院有限公司,四川 成都 611130
- 折叠
摘要
Abstract
Research and exploration on the EPC construction mode have shown that,based on the principles of complementary advantages,strong alliances,and unity and cooperation,the core competitiveness of the consor-tium can be enhanced,thereby achieving the goal of win-win for all parties in the consortium,which is the main mode of EPC construction.This article discusses several issues related to the integration of design and con-struction in general contracting projects.At the same time,combined with the organizational mode of the third Bid of the Tingzikou Irrigation Area Phase I Project,the management process and key points of EPC project that is led by the engineering part are proposed,which will help the high-quality development of the general contracting mode,improve the cost control management level of the general contracting mode,and provide ref-erence for owners and general contractors.关键词
EPC总承包/设计/施工/一体化/亭子口灌区一期工程Key words
EPC General Contracting/Design/Construction/Integration/Tingzikou Irrigation Area Phase I Project分类
建筑与水利引用本文复制引用
于晓飞,王广巍,张传航..EPC总承包模式下设计施工一体化相关问题探讨[J].四川水力发电,2024,43(2):38-41,4.