| 注册
首页|期刊导航|市政技术|底部填芯预制节段拼装桥墩抗震性能数值仿真分析

底部填芯预制节段拼装桥墩抗震性能数值仿真分析

郦炎森 贾俊峰 杨凯 张凯迪 杨大海 赵建瑜 邓贺丹

市政技术2024,Vol.42Issue(4):172-183,244,13.
市政技术2024,Vol.42Issue(4):172-183,244,13.DOI:10.19922/j.1009-7767.2024.04.172

底部填芯预制节段拼装桥墩抗震性能数值仿真分析

Numerical Simulation Analysis of Seismic Performance of Prefabricated Segmental Assembled Piers with Core Filling at the Bottom

郦炎森 1贾俊峰 1杨凯 2张凯迪 1杨大海 2赵建瑜 3邓贺丹3

作者信息

  • 1. 北京工业大学城市与工程安全减灾教育部重点实验室,北京 100124
  • 2. 安徽省交通规划设计研究总院股份有限公司,安徽合肥 230088
  • 3. 中国恩菲工程技术有限公司,北京 100080
  • 折叠

摘要

Abstract

In order to promote the application of prefabricated segmental assembled piers in the complex environ-ment of mountainous areas and strong seismic areas,a kind of prefabricated segmental assembled pier with core fill-ing at the bottom is proposed.ABAQUS finite element model is used to discuss the influence of key parameters such as the height of core filling sections,the initial tensioning force and the reinforcement ratio of energy dissipation bar on the seismic performance of the prefabricated segmental assembled piers with core filling at the bottom.The results show that the bearing capacity and energy consumption capacity of the prefabricated segmental assembled piers with core filling at the bottom increases significantly with the increase of the height of core filling sections.But the residual displacement and the width of the joint opening in the upper part of the core filling sections also increase;With the increase of the initial tensioning force,the bearing capacity and energy consumption capacity of the prefabricated segmental assembled piers with core filling at the bottom increase slightly,and the residual displacement and the damage of the concrete at the bottom of the pier are basically unchanged;With the increase of the reinforcement rate of energy dissipation bar,the bearing capacity and energy consumption capacity of the prefabricated segmental as-sembled piers with core filling at the bottom increases.But the width of the upper joint opening of the core-filled segment increases.The results can provide reference for the reasonable construction of precast segmental piers with core filling at the bottom,and promote the application of precast segmental piers in mountainous areas with complex environments and strong seismic zones.

关键词

预制节段拼装桥墩/底部填芯/抗震性能/填芯段高度/初始张拉力/耗能钢筋配筋率

Key words

prefabricated segmental assembled piers/core filling at the bottom/seismic performance/height of core filling section/initial tensioning force/reinforcement ratio of energy dissipation bar

分类

交通运输

引用本文复制引用

郦炎森,贾俊峰,杨凯,张凯迪,杨大海,赵建瑜,邓贺丹..底部填芯预制节段拼装桥墩抗震性能数值仿真分析[J].市政技术,2024,42(4):172-183,244,13.

基金项目

北京市自然科学基金(8234060) (8234060)

市政技术

1009-7767

访问量0
|
下载量0
段落导航相关论文