| 注册
首页|期刊导航|铁道科学与工程学报|高铁大跨度斜拉桥上无砟轨道变形适应性理论与试验研究

高铁大跨度斜拉桥上无砟轨道变形适应性理论与试验研究

郑纬奇 朱志辉 盛兴旺 李的平 郭舜哲

铁道科学与工程学报2024,Vol.21Issue(4):1286-1297,12.
铁道科学与工程学报2024,Vol.21Issue(4):1286-1297,12.DOI:10.19713/j.cnki.43-1423/u.T20230860

高铁大跨度斜拉桥上无砟轨道变形适应性理论与试验研究

Theoretical and experimental research on deformation adaptability of ballastless tracks on long-span cable-stayed bridge in high-speed railway

郑纬奇 1朱志辉 1盛兴旺 2李的平 3郭舜哲2

作者信息

  • 1. 中南大学 土木工程学院,湖南 长沙 410075||高速铁路建造技术国家工程研究中心,湖南 长沙 410075
  • 2. 中南大学 土木工程学院,湖南 长沙 410075
  • 3. 中铁第四勘察设计院集团有限公司,湖北 武汉 430063
  • 折叠

摘要

Abstract

The application of ballastless track on long-span cable-stayed bridge of high-speed railway can improve the railway smoothness and stability,eliminate potential railway speed restrictions,unify track types,and reduce the maintenance cost of the track,which is an important technological innovation of high-speed railway in China.In this work,based on the first long-span cable-stayed bridge with ballastless track named Ganzhou Ganjiang bridge in Chang-Ji-Gan passenger dedicated line,the refined finite element model of long-span cable-stayed bridge with ballastless track was established,the deformation characteristics of the long-span cable-stayed bridge with ballastless track system were explored,the equivalent scale test model of long-span cable-stayed bridge with ballastless track was designed and produced,and the theoretical and experimental deformation adaptability research of long-span cable-stayed bridge with ballastless track was carried out.Therefore,the effects of different lengths,types of isolation layers and arrangements of ballastless track on long-span cable-stayed bridge were analyzed,and the deformation followability and coordination of ballastless track on long-span cable-stayed bridge under various deformation conditions were studied.The main conclusions are as follows:the beam end rotation and the overall deflection of the main girder can be controlled according to the relevant limits of small and medium-span bridges in current specifications in China,and the local deformation of the main girder should be reasonably controlled to avoid voids between the ballastless track and long-span bridge;The technical scheme of the unit ballastless track with rubber isolation layer laid on the long-span cable-stayed bridge is proposed,and the buffer effect of the rubber isolation layer in ballastless track and the design goal of"separation without separation"at ballastless track interlayer is put forward,so as to significantly improve the deformation adaptability of the ballastless track laid on long-span cable-stayed bridge.Therefore,this work provides a valuable technical support for the application of ballastless tracks on the long-span cable-stayed bridge in high-speed railway.

关键词

高速铁路/大跨度斜拉桥/无砟轨道/隔离层/变形适应性/试验研究

Key words

high-speed railway/long-span cable-stayed bridge/ballastless tracks/isolation layer/deformation adaptability/experimental research

分类

交通工程

引用本文复制引用

郑纬奇,朱志辉,盛兴旺,李的平,郭舜哲..高铁大跨度斜拉桥上无砟轨道变形适应性理论与试验研究[J].铁道科学与工程学报,2024,21(4):1286-1297,12.

基金项目

国家自然科学基金资助项目(52078488) (52078488)

湖南省自然科学基金资助项目(2022JJ40628) (2022JJ40628)

湖南省教育厅科学研究项目(21A0010) (21A0010)

中国国家铁路集团有限公司科技研究开发计划项目(L2021G007) (L2021G007)

铁道科学与工程学报

OA北大核心CSTPCDEI

1672-7029

访问量0
|
下载量0
段落导航相关论文