| 注册
首页|期刊导航|铁道科学与工程学报|公共价值视域下PPP项目回报机制决策研究:基于PSO-TRP模型

公共价值视域下PPP项目回报机制决策研究:基于PSO-TRP模型

石世英 赵方方 李瑚均 陈辉华 胡晓珂

铁道科学与工程学报2024,Vol.21Issue(4):1634-1644,11.
铁道科学与工程学报2024,Vol.21Issue(4):1634-1644,11.DOI:10.19713/j.cnki.43-1423/u.T20231160

公共价值视域下PPP项目回报机制决策研究:基于PSO-TRP模型

Study on the decision of PPP project return mechanism under the public value perspective:based on PSO-TRP model

石世英 1赵方方 1李瑚均 1陈辉华 2胡晓珂3

作者信息

  • 1. 河南理工大学 土木工程学院,河南 焦作 454003
  • 2. 中南大学 土木工程学院,湖南 长沙 410075
  • 3. 河海大学 商学院,江苏 南京 211100
  • 折叠

摘要

Abstract

The return mechanism is the core attribute of Public-Private Partnership(PPP)projects,and the government is the key decision-making body of the cooperative production of public services in PPP projects.The decision-making logic of its return mechanism is related to the balance between the public nature of the PPP project and the economic efficiency,which is the key issue that directly affects the success or failure of the PPP project.First,the research hypotheses were proposed by comprehensively considering the public nature of PPP projects,the reference point effect,and the law of diminishing marginal utility.Second,the tri-reference point theory(TRP)was introduced to construct a decision model of the PPP project return mechanism and analyze its constraints.Finally,the particle swarm algorithm was used to conduct case simulation,scenario simulation,and option selection for the decision-making problem of the government,aiming at how to choose the payoff mechanism in order to maximize the utility in the context of budget constraints and bottom line logic.The study found that:1)the government's perceived value in PPP projects increases and then decreases as the goal rises,showing an inverted U-shaped distribution,with the perceived value and effort level increasing with the bottom line,and the optimal position is that the public value is maximized.2)When the government's bottom line is certain and the target is high,the government fully or partially cedes public resources to the social capital body,choosing the user-payment or feasibility gap subsidy mode.3)When the value of the government's psychological weight changes,the greater the weight of success,the subject in the optimal range of objectives increases the degree of their inputs,and chooses risky behavior based on public value;when the greater the weight of failure,the subject of the decision-making process would reduce the degree of their input,and choose to protect the bottom of the behavior based on public value.Based on the public value perspective and the introduction of the tri-reference point theory,the study constructed a decision-making model for the return mechanism of PPP projects based on particle swarm algorithm,which provides a new idea for the research of governmental decision-making in PPP projects,and at the same time provides a reference for the maintenance of the public nature of PPP projects and the realization of public value.

关键词

PPP项目/回报机制/公共价值/三参照点理论/底线思维/粒子群算法

Key words

PPP project/payback mechanism/public values/tri-reference point theory/bottom line thinking/particle swarm optimization

分类

管理科学

引用本文复制引用

石世英,赵方方,李瑚均,陈辉华,胡晓珂..公共价值视域下PPP项目回报机制决策研究:基于PSO-TRP模型[J].铁道科学与工程学报,2024,21(4):1634-1644,11.

基金项目

国家自然科学基金重大专项资助项目(71942006) (71942006)

河南理工大学博士基金资助项目(SKB2018-01,B2022-23) (SKB2018-01,B2022-23)

铁道科学与工程学报

OA北大核心CSTPCDEI

1672-7029

访问量5
|
下载量0
段落导航相关论文