| 注册
首页|期刊导航|东北电力技术|发电机进相试验与主变分接选择的仿真研究

发电机进相试验与主变分接选择的仿真研究

李相彤

东北电力技术2024,Vol.45Issue(4):48-51,4.
东北电力技术2024,Vol.45Issue(4):48-51,4.

发电机进相试验与主变分接选择的仿真研究

Simulation Research on Generator Phase Test and Main Transformer Tap Selection

李相彤1

作者信息

  • 1. 国家电投东北电力有限公司抚顺热电分公司,辽宁 抚顺 113006
  • 折叠

摘要

Abstract

It introduces the application method of the simulation system of generator phase test.According to the analysis of the low phase capability of a hydropower plant generator due to low terminal voltage during phase test,the operation data and leading phase test data of the units with different main variations tap are simulated and calculated by the simulation system of the generator phase test appli-cation,and the simulation data is compared with the phase test data after adjusting the main generator tap.The importance of the simula-tion system of generator leading phase test to leading phase test is verified,which ensures the safe and stable operation of the unit.

关键词

发电机/进相/仿真

Key words

generator/phase/simulation

分类

信息技术与安全科学

引用本文复制引用

李相彤..发电机进相试验与主变分接选择的仿真研究[J].东北电力技术,2024,45(4):48-51,4.

东北电力技术

1004-7913

访问量0
|
下载量0
段落导航相关论文