| 注册
首页|期刊导航|设备监理|全断面隧道掘进机盾体结构件制造设备监理实践

全断面隧道掘进机盾体结构件制造设备监理实践

王奇超 缪楠 李顺旭 李文虎 王之鑫

设备监理Issue(2):8-11,4.
设备监理Issue(2):8-11,4.DOI:10.19919/j.issn.2095-2465.2024.04.003

全断面隧道掘进机盾体结构件制造设备监理实践

Supervision Practice of Manufacturing Equipment for Shield Structure Components of Full Section Tunnel Boring Machine

王奇超 1缪楠 1李顺旭 1李文虎 1王之鑫1

作者信息

  • 1. 中铁隧道局集团有限公司设备分公司 广州 511458
  • 折叠

摘要

Abstract

Usually,the shield body of a full face tunnel boring machine is mainly divided into a front shield,a middle shield,and a tail shield.It is the main equipment of the full face tunnel boring machine and serves as the main support body for soil support and overall pressure bearing.Its importance is self-evident.This article starts from the entire manufacturing process of the shield structure,focuses on quality control at each node,and analyzes the key points of progress control based on the importance of each manufacturing stage to the construction period.Provide some insights and references for equipment supervision in the manufacturing process of shield structural components.

关键词

盾体/设备监理/质量控制/进度控制

Key words

Shield/Equipment supervision/Quality control/Progress control

分类

通用工业技术

引用本文复制引用

王奇超,缪楠,李顺旭,李文虎,王之鑫..全断面隧道掘进机盾体结构件制造设备监理实践[J].设备监理,2024,(2):8-11,4.

设备监理

2095-2465

访问量0
|
下载量0
段落导航相关论文