| 注册
首页|期刊导航|现代电力|可控储热负荷参与电网调峰的系统特性与经济性研究

可控储热负荷参与电网调峰的系统特性与经济性研究

洪海涵 吕志鹏 胡晓

现代电力2024,Vol.41Issue(2):344-352,9.
现代电力2024,Vol.41Issue(2):344-352,9.DOI:10.19725/j.cnki.1007-2322.2022.0227

可控储热负荷参与电网调峰的系统特性与经济性研究

Research on System Characteristics and Economy of Controllable Heat Storage Load Participating in Power Grid Peak Shaving

洪海涵 1吕志鹏 2胡晓3

作者信息

  • 1. 上海电力大学电子与信息工程学院,上海市浦东新区 200090
  • 2. 中国电力科学研究院有限公司,北京市海淀区 100192
  • 3. 国网智能电网研究院有限公司,北京市昌平区 102209
  • 折叠

摘要

Abstract

To address the problems of large installed capacity of renewable power yet with relatively low output and inad-equate peak shaving capacity of the power system,this article elaborates and analyzes how to maximize the potential of the user side in the power system through the emerging solid-state electric heating and heat storage technology.A system model of the solid-state electric heating and heat storage equipment with power demand response on the user side was designed and es-tablished,aiming at the maximum amount of wind power con-sumed by the system and the optimal economy of the user side in operation.The article adopted the improved multi-objective particle swarm operation(MOPSO)algorithm for model optim-ization and model solution.A comparative analysis of wind power accommodation capacity,load curve peak-to-valley dif-ference and economic cost under diverse conditions was con-ducted in the source side,grid side and load side of the power side system.The simulation results show that the wind power consumption capacity and peak shaving capability have been significantly improved with the installation of the solid-state electric heating and heat storage equipment on the user side on the basis of demand response.In addition,this method has cer-tain economic value.

关键词

固态电制热储热/风电消纳/削峰填谷/源网荷储/多目标粒子群

Key words

solid-state electric heating thermal storage/wind power consumption/shaving peaks and filling valleys/source network load storage/MOPSO

分类

信息技术与安全科学

引用本文复制引用

洪海涵,吕志鹏,胡晓..可控储热负荷参与电网调峰的系统特性与经济性研究[J].现代电力,2024,41(2):344-352,9.

基金项目

基于高温相变储热的冷热联供系统在电网调峰中的应用研究(5419-202119243A-0-0-00).Research on Application of Combined Cooling and Heating System Based on High Temperature Phase Change Thermal Storage in Peak-load Regulation of Power Grid(5419-202119243A-0-0-00). (5419-202119243A-0-0-00)

现代电力

OA北大核心CSTPCD

1007-2322

访问量4
|
下载量0
段落导航相关论文