Multi-time Collaborative Restoration for Integrated Electrical-gas Distribution Systems Based on Rolling OptimizationOACSTPCDEI
Multi-time Collaborative Restoration for Integrated Electrical-gas Distribution Systems Based on Rolling Optimization
This paper proposes a multi-time collaborative restoration model for integrated electricity-gas distribution sys-tems(IEGDSs)considering multiple resources after extreme weather events.Based on the linearized power flow constraints of the unbalanced electrical distribution system(EDS)and gas distribution system(GDS),this problem can be formulated as a mixed-integer linear programming(MILP)model.To improve the efficiency and veracity of the solution,a rolling optimiza-tion based two-stage method is developed with the first stage solved by a linear approximation model,and the second stage solved by real-time updated rolling optimization.By solving the MILP problem using rolling optimization,the proposed model and solution method achieve efficient and reliable collaborative restoration of IEGDS considering multiple resources and unbal-anced operation characteristics of EDS.The effectiveness of the proposed model and method is validated by using an IEGDS made of a 37-bus unbalanced EDS and 11-node GDS.
Jingyang Yun;Zheng Yan;Yun Zhou;Peichao Zhang;Weidong Hu
Key Laboratory of Control of Power Transmission and Conversion of Ministry of Education,Department of Electrical Engineering,Shanghai Jiao Tong University
Electricity-gas systemmix-integer linear programmingpower system restoration
《中国电机工程学会电力与能源系统学报(英文版)》 2024 (002)
660-671 / 12
This work was supported by the National Natural Science Foundation of China under Grant(51907122);National Key R&D Program of China under Giant(2018YFB0905000);Science and Technology Project of State Grid Corporation of China(SGTJDK00DWJS1800232).
评论