用于快速响应负荷需求的两段式斜坡重力储能系统放电功率调节方法OACSTPCD
Discharging Power Adjustment of Two-Stage Ramp-Type Gravity Energy Storage System for Fast Response to Load Demand
斜坡式重力储能系统(GESS)放电时通常将上堆场重物块运送至下堆场.然而,当放电过程中系统负荷需求出现波动时,现有方案难以通过及时调整重物块数量来调节输出功率,导致重力储能系统响应不及时并造成额外能量损耗.通过在斜坡两侧增加辅助堆场并将斜坡分为两段,通过控制顶部堆场重物块释放数量、斜坡堆场释放高度以及斜坡堆场重物块抓取位置,实现了重力储能系统输出功率的精确控制与负荷需求的快速响应.基于Matlab/Simulink平台搭建了两段式斜坡重力储能系统…查看全部>>
Generally,discharging conditions of ramp-type gravity energy storage system(GESS)can be realized by transporting heavy blocks from the upper stacking yard to the lower one.However,the number of heavy blocks may not be adjusted timely when load demand fluctuates during discharging process,which may cause the delayed response and additional energy loss of GESS.By configuring auxiliary heavy blocks stacking yards on both sides of the ramp rail and dividing the …查看全部>>
李明;亚夏尔·吐尔洪;查鲲鹏;郭高朋;郝梓琳;赵海森
国网新疆电力有限公司,新疆乌鲁木齐 830000国网新疆电力有限公司,新疆乌鲁木齐 830000中电普瑞电力工程有限公司,北京 102299中电普瑞电力工程有限公司,北京 102299华北电力大学电气与电子工程学院,北京 102206华北电力大学电气与电子工程学院,北京 102206
能源与动力
重力储能系统放电功率调节负荷需求快速响应
gravity energy storage systemdischarging power adjustmentload demandfast response
《电机与控制应用》 2024 (4)
12-19,8
国家电网公司科技项目(5419-202240053A-1-1-ZN)State Grid Corporation of China for Science and Technology Pojects(5419-202240053A-1-1-ZN)