南水北调西线工程水源区可调水量"十问"

胡鹏 董宁澎 闫龙 阿膺兰 张丰博 唐家璇 王玉莲 王建华 王浩 赵勇 宁远 蒋云钟 刘欢 曾庆慧 杨泽凡 周毓彦

中国工程科学2024,Vol.26Issue(2):210-223,14.
中国工程科学2024,Vol.26Issue(2):210-223,14.DOI:10.15302/J-SSCAE-2023.07.032

南水北调西线工程水源区可调水量"十问"

Ten Questions on Adjustable Water Volume of the Western Route of South-to-North Water Diversion Project

胡鹏 1董宁澎 1闫龙 1阿膺兰 1张丰博 1唐家璇 2王玉莲 3王建华 1王浩 1赵勇 1宁远 4蒋云钟 1刘欢 1曾庆慧 1杨泽凡 1周毓彦1

作者信息

  • 1. 中国水利水电科学研究院,北京 100038||流域水循环模拟与调控国家重点实验室,北京 100038
  • 2. 中国水利水电科学研究院,北京 100038||流域水循环模拟与调控国家重点实验室,北京 100038||天津大学建筑工程学院,天津 300350
  • 3. 中国水利水电科学研究院,北京 100038||流域水循环模拟与调控国家重点实验室,北京 100038||安徽理工大学地球与环境学院,安徽淮南 232001
  • 4. 南水北调工程专家委员会,北京 100038
  • 折叠

摘要

Abstract

The Western Route of the South-to-North Water Diversion Project is the final link to be constructed for the four-horizontal three-vertical framework of China's national water network.The adjustable water volume in the water source areas is a focal and challenging issue in the planning and demonstration of the Western Route.This study raised ten questions related to the adjustable water volume in the water source areas of the Western Route from the aspects of water resource background conditions and evolution trends,ecological and socio-economic water demands,scales of reservoirs and water conveyance projects,as well as impacts of water diversion on water resource development and utilization,aquatic ecological environment,hydropower,and navigation in the water source areas and their lower reaches.Based on a distributed hydrological model of the upper reaches of the Yangtze River,a simulation and analysis model for calculating the adjustable water volume in water source areas of the Western Route is established to quantitatively answer the ten questions raised.The main conclusions are as follows.First,under the premise of solely satisfying ecological and socio-economic water demands within and outside the river channels of the water source areas,a plan that combines upper and lower routes presents an average adjustable water volume of 1.59×1010 m³ over multiple years,while a plan for solely constructing a lower route can reach an average adjustable water volume of 1.74×1010 m³ by constructing the Gangtuo Reservoir for coordinated operation.Second,comprehensively considering the impacts of water diversion on water balance,hydropower,and navigation,as well as their acceptability in the water source areas,the adjustable water volume is between 1.22×1010 and 1.26×1010 m³.Third,in the long term,the plan should focus on connecting and integrating the water network in the southwestern region with the main framework and major streams of the national water network of China.This will reduce the impacts of water diversion by the Western Route Project,increase the overall water supply capacity of the project,and promote its adaptability to external conditions such as climate change.

关键词

南水北调西线工程/水源区/可调水量/生态需水/跨流域调水

Key words

Western Route of South-to-North Water Diversion Project/water source areas/adjustable water volume/ecological water demand/inter-basin water transfer

分类

建筑与水利

引用本文复制引用

胡鹏,董宁澎,闫龙,阿膺兰,张丰博,唐家璇,王玉莲,王建华,王浩,赵勇,宁远,蒋云钟,刘欢,曾庆慧,杨泽凡,周毓彦..南水北调西线工程水源区可调水量"十问"[J].中国工程科学,2024,26(2):210-223,14.

基金项目

国家重点研发计划项目(2021YFC3200202) (2021YFC3200202)

中国工程院咨询项目"健康水平衡构建与国土高质量保护利用战略(一期)"(2022-PP-04) (一期)

国家自然科学基金项目(52122902,U2240202) National Key R&D Program of China(2021YFC3200 202) (52122902,U2240202)

Chinese Academy of Engineering project"Construction of Healthy Water Balance and the Strategy for High-Quality Conservation and Utilization of Land(Phase One)"(2022-PP-04) (Phase One)

National Natural Science Fund Project(52122902,U2240202) (52122902,U2240202)