安徽地质2024,Vol.34Issue(1):56-59,76,5.
露采矿山溜井工程防治水技术研究
A study on water control for the ore pass of an open-pit mine:An example from the water control engineering for No.2 ore pass of the Shenshan limestone mine,Guichi,Anhui
崔伟 1杨力伟 2陈戈2
作者信息
- 1. 安徽省地质矿产勘查局312地质队,安徽蚌埠 233040
- 2. 安徽省地勘局第一水文工程地质勘查院,安徽蚌埠 233000
- 折叠
摘要
Abstract
In order to effectively control long-term water gushing of the wall rock of No.2 ore pass in the Shenshan limestone mine in Guishi District,Anhui Province,on the basis of identification of the karst hydrogeological conditions around the ore pass,combined with the latest research results of water control technology,a combination of drain well+drainage gallery+diversion hole+wall water gushing point plugging was proposed,which proved effective in draining the karst water from the wall rock of the ore pass and preventing long-term water gushing.关键词
露采矿山/溜井/疏排/防治水Key words
open-pit mine/ore pass/water drainage/water control分类
天文与地球科学引用本文复制引用
崔伟,杨力伟,陈戈..露采矿山溜井工程防治水技术研究[J].安徽地质,2024,34(1):56-59,76,5.