摘要
Abstract
At present,the use of water resources in industrial parks not only has high consumption,but also has serious pollution emission problems.Therefore,it is necessary to further improve and optimize the water resources network of the park as a whole to improve the efficiency of water resources.In this paper,the mathematical planning method is used to optimize the indirect water recycling network in the park,which is discussed in detail.According to the specific drainage consumption quantity of each enterprise in the park,as well as different water qualities,and with full consideration of the environment and the economy and other factors,the optimization model is established and the optimization method is explored,which ensures that the water resources indirectly recycled in the park have a high degree of applicability.关键词
数学规划法/工业园区/间接循环/水网络/运行成本Key words
mathematical planning method/industrial park/indirect recycling/water network/operating costs分类
建筑与水利