大断面矩形顶管超近接下穿既有管线施工控制技术研究OA

Construction Control Technology of Large Cross-section Rectangular Top Pipe Super Close Crossing the Existing Pipelines

中文摘要英文摘要

为确保大断面矩形顶管超近接穿越既有污水管线的顺利实施,结合风险源等级及大断面土压平衡矩形顶管的施工原理,以北京地铁昌南线上清桥站出入口矩形顶管工程为依托,通过建立数值模型进行了计算预测,总结和分析了关键施工控制措施,创新性地得到了大断面矩形顶管超近接下穿既有污水管线施工关键技术:在既有管线结构周边土体进行注浆加固,提高既有管线周边土体的强度;提前截流导流,实施紫外线原位固化技术,确保既有管线结构自身的安全;土压平衡顶管机全土压始发和超土压掘进,确保顶管顶进过程中对周边土体微扰动;通过泥浆置换,减少后期既有管线结构的蠕变变形.实测数据表明:采用该超近接穿越关键控制技术施工,既有污水管线沉降远小于控制值.该技术可为城市地铁车站出入口超近接穿越既有管线结构施工提供借鉴和指导.

In order to ensure the smooth implementation of large cross-section rectangular top pipes close crossing of existing sewage pipelines,combined with the risk source levels and the construction principle of large cross-section earth pressure balance rectangular top pipes,based on the rectangular top pipe project at the entrance and exit of Qingqiao Station on the Changnan Line of Beijing Metro,numerical models were established for calculation predic-tion.The key construction control measures were summarized and analyzed to innovatively obtain the key construc-tion technologies for large cross-section rectangular top pipes close crossing existing sewage pipelines;Gouting re-inforcement was carried out on the soil around the existing pipeline structure to improve the strength of the soil around the existing pipeline;Advance interception and diversion and implementation of UV in-situ curing technol-ogy to ensure the safety of the existing pipeline structure itself;The full earth pressure during the initiation and ex-cessive earth pressure excavation of the earth pressure balance pipe jacking machine ensure that there is no slight disturbance to the surrounding soil during the pipe jacking process;Finally,that mud replacement reduce the creep deformation of the existing pipeline structure in the later stage.The measured data shows that the key control tech-nology of ultra close crossing make the settlement of existing sewage pipelines is much smaller than the control value.This technology can provide reference and guidiance for the construction of same projects.

李宗;孟毅欣;易本奇;傅睿智;何华飞;闫宏锦

北京市政建设集团有限责任公司,北京 100089

交通运输

矩形顶管土压平衡超近接穿越既有结构施工控制

rectangular pipe jackingearth pressure balanceultra close crossingexisting structureconstruction control

《市政技术》 2024 (005)

115-122 / 8

北京市政建设集团有限责任公司科技创新项目(2021-11)

10.19922/j.1009-7767.2024.05.115