西北水电Issue(2):89-98,10.DOI:10.3969/j.issn.1006-2610.2024.02.015
基于BIM技术的塔式光热电站建设过程应用
Exploration and Application of BIM Technology in the Construction Process of Tower-Type Photo-Thermal Power Station
摘要
Abstract
With the advantages of heat storage,peak shifting and continuous power generation,photo-thermal power station has gradually become a hotspot for study in the field of renewable energy.However,the construction process involves complicated specialties and many construction contents,which leads to problems such as time constraints in the project implementation process,high level of construction requirements,and high risks in project safety management.Therefore,based on BIM technology,taking the Qinghai Gonghe tower-type photo-thermal power station as an example,this paper explores and practices the application of BIM technology in the construction of tow-er-type Qinghai Gonghe photo-thermal power station from the perspectives of BIM model construction,interference check,3D joint re-view,workload statistics,4D progress management,material visual management,safety control and full-process digital handover,etc..By BIM multi-platform modeling and design,it breaks through the barrier of data interoperability of multi-platform models,realizes light-weight final assembly of models,improves project quality,and provides reference for high-quality construction of photo-thermal power projects.关键词
光热电站/BIM/塔式光热/质量控制/施工应用Key words
photo-thermal power station/BIM/tower-type photo-thermal power station/quality control/construction application分类
信息技术与安全科学引用本文复制引用
黄勇,霍云超,辛存,郭园,吕祎航..基于BIM技术的塔式光热电站建设过程应用[J].西北水电,2024,(2):89-98,10.基金项目
国家重点研发计划(2023YFF0905500). (2023YFF0905500)