抽水蓄能电站勘探平洞掏槽爆破方法研究
Study on the Method of Excavation and Blasting for Exploration Tunnels in Pumped Storage Power Stations
摘要
Abstract
In order to solve the problem of low footage in a single cycle of drilling and blasting tunnels for pumped storage power station exploration,and speed up the progress of engineering geological survey and construction of pumped storage power stations,a new method of"large-diameter hollow hole ring+barrel multi-stage"cutting is proposed,and the rationality of its parameters and rock breaking mechanism are analyzed.Engineering application results show that the cutting method can increase and stabilize the single-cycle average footage and monthly average footage of pumped-storage exploration tunnels(small cross-section)to3.12 m and280 m respectively.The method has significant applicability and superiority in rapid construction.At the same time,it has extremely high promotion and applica-tion value in small-section tunnels with rapid excavation requirements such as pumped-storage exploration tunnels,mine rock tunnels,pumped-storage drainage corridors,etc.关键词
抽水蓄能电站/大直径空孔环掏槽/勘探平洞/小断面Key words
pumped storage power station/large-diameter hollow hole ring cutting groove/exploration tunnel/small cross-section分类
矿业与冶金引用本文复制引用
左俊,张茂晨,路世伟,周彩贵,朱金财..抽水蓄能电站勘探平洞掏槽爆破方法研究[J].西北水电,2024,(2):26-32,7.基金项目
湖北省自然科学基金(2019CFB224) (2019CFB224)
爆破工程湖北省重点实验室开放基金(HKLBEF202011). (HKLBEF202011)