北京水务Issue(z1):60-64,5.DOI:10.19671/j.1673-4637.2024.S1.012
官厅水库溢洪道闸门及启闭机安全监测与复核计算
Safety inspection and review calculation of spillway gate hoist in Guanting Reservoir
宗睿 1杨艳红 1申琪 1王琦 1宋建涛1
作者信息
- 1. 北京市官厅水库管理处 河北张家口 075441
- 折叠
摘要
Abstract
To ensure the safe operation of the Guanting Reservoir Hub Project,grasp the operational characteristics of the reservoir's metal structure,timely identify hidden dangers that affect safe operation,conduct safety inspections and recheck calculations on the metal structure,and evaluate its safety status,providing scientific basis for the next operational decision-making.This article takes the isolated gate of the Guanting Reservoir spillway as an example,mainly introducing the safety inspection of the gate open-ing and closing machine,and the calculation of gate stress review.The evaluation results can provide ref-erence for the safe operation,maintenance and renovation of Guanting Reservoir.关键词
官厅水库/安全检测/闸门/启闭机Key words
Guanting Reservoir/safety inspection/sluice gate/gate hoist分类
建筑与水利引用本文复制引用
宗睿,杨艳红,申琪,王琦,宋建涛..官厅水库溢洪道闸门及启闭机安全监测与复核计算[J].北京水务,2024,(z1):60-64,5.