| 注册
首页|期刊导航|现代制造工程|考虑运输时间的混合流水车间绿色生产调度

考虑运输时间的混合流水车间绿色生产调度

唐艺军 杜纪浩 李雪

现代制造工程Issue(5):23-30,8.
现代制造工程Issue(5):23-30,8.DOI:10.16731/j.cnki.1671-3133.2024.05.004

考虑运输时间的混合流水车间绿色生产调度

Green production scheduling of hybrid flow shop considering transportation time

唐艺军 1杜纪浩 1李雪1

作者信息

  • 1. 辽宁工程技术大学工商管理学院,葫芦岛 125000
  • 折叠

摘要

Abstract

Aiming at the influence of transportation time on green production scheduling of mixed flow workshop,the maximum completion time,production energy consumption and production cost were taken as optimization objectives.An Improved Multi-Objective Sparrow Search Algorithm(IMOSSA)was proposed to solve the problem.The fitness values of the population were di-vided by reference to non-dominated ordering,the quality of the solution set was improved by introducing sine-cosine strategy,and the convergence speed and global search ability of the solution set were improved by adding polynomial mutation operators and Levy flight,so as to avoid falling into local optimality.Then 16 test examples were designed to compare IMOSSA with other multi-objective optimization algorithms to verify the superiority of IMOSSA solution.Finally,taking an actual production workshop as an example,the production scheduling was divided into four modes to prove the practicability of the algorithm.

关键词

混合流水车间/绿色生产调度/不相关并行机/运输时间/多目标麻雀搜索算法

Key words

mixing flow shop/green production scheduling/unrelated parallel machines/transit time/Multi-Objective Sparrow Search Algorithm(MOSSA)

分类

信息技术与安全科学

引用本文复制引用

唐艺军,杜纪浩,李雪..考虑运输时间的混合流水车间绿色生产调度[J].现代制造工程,2024,(5):23-30,8.

现代制造工程

OA北大核心CSTPCD

1671-3133

访问量0
|
下载量0
段落导航相关论文