洮河三甲水电站枢纽工程地质条件与评价

黄登伟

云南水力发电2024,Vol.40Issue(5):55-57,3.
云南水力发电2024,Vol.40Issue(5):55-57,3.DOI:10.3969/j.issn.1006-3951.2024.05.013

洮河三甲水电站枢纽工程地质条件与评价

Geological Conditions and Evaluation of Taohe Sanjia Hydropower Station Key Project

黄登伟1

作者信息

  • 1. 甘肃甘兰水利水电勘测设计院有限责任公司,甘肃 兰州 730000
  • 折叠

摘要

Abstract

Taohe Sanjia Hydropower Station has been in operation for 24 years and requires pump station renovation and renovation.Therefore,it is necessary to evaluate and analyze the basic geological conditions and existing engineering geological problems of Taohe Sanjia Hydropower Station project area.This paper mainly comprehensively discusses the terrain,lithology,physical geological phenomena,geological structures and adverse geological phenomena,hydrogeology,and other aspects.It evaluates geological problems such as reservoir leakage,reservoir immersion,and reservoir bank stability in the reservoir area.Furthermore,it analyzes and evaluates the geological conditions of the dam foundation and shoulder,providing technical guidance for the next step of hydropower station renovation.

关键词

水电站/枢纽工程/水库库区/工程地质条件/地质评价

Key words

hydropower station/key project/reservoir area/engineering geological condition/geological evaluation

分类

建筑与水利

引用本文复制引用

黄登伟..洮河三甲水电站枢纽工程地质条件与评价[J].云南水力发电,2024,40(5):55-57,3.