超大地下洞室群灌浆施工组织与管理

周永兵 李绍平 李光进 刘江辉

云南水力发电2024,Vol.40Issue(5):125-129,5.
云南水力发电2024,Vol.40Issue(5):125-129,5.DOI:10.3969/j.issn.1006-3951.2024.05.031

超大地下洞室群灌浆施工组织与管理

Construction Organization and Management of Grouting for Super Large Underground Cavern Group

周永兵 1李绍平 1李光进 1刘江辉1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The tailwater system of Baihetan Hydropower Station is a super large underground cavern group,with multiple types of caverns,large cross-sections,long tunnels,complex structures,and a huge amount of grouting work.There are multiple tunnel sections being constructed simultaneously,and multiple processes operating in the same tunnel section.In response to the problems of huge grouting volume,tight construction period,high strength,and cross interference with concrete pouring construction,this paper systematically analyzes and studies the organization and management of grouting construction for super large cavern groups,and successfully applies the results to the organization and management of grouting construction in this project.It effectively improves construction progress,saves costs,and generates good economic and social benefits.

关键词

超大洞室群/灌浆施工/施工组织/管理

Key words

super large cavern group/grouting construction/construction organization/management