| 注册
首页|期刊导航|云南水力发电|关于隧洞污水沉淀池管理的见解

关于隧洞污水沉淀池管理的见解

王海涛

云南水力发电2024,Vol.40Issue(z1):39-41,3.
云南水力发电2024,Vol.40Issue(z1):39-41,3.DOI:10.3969/j.issn.1006-3951.2024.Z1.011

关于隧洞污水沉淀池管理的见解

Management of Tunnel Sewage Sedimentation Tank

王海涛1

作者信息

  • 1. 云南省滇中引水二期工程有限公司,云南 昆明 650000
  • 折叠

摘要

Abstract

Due to the fact that the water diversion tunnel is mostly buried below the groundwater level,there are problems such as large tunnel water output and high requirements for tunnel sewage treatment.This paper mainly discusses the sewage treatment methods,pollution points,and management points of sedimentation tanks in tunnel engineering,and selects a reasonable tunnel sewage treatment method that can effectively treat tunnel sewage.

关键词

隧洞污水/沉淀池/处理工艺/处理方式

Key words

tunnel sewage/sedimentation tank/treatment process/processing method

分类

建筑与水利

引用本文复制引用

王海涛..关于隧洞污水沉淀池管理的见解[J].云南水力发电,2024,40(z1):39-41,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文