| 注册
首页|期刊导航|云南水力发电|大朝山水电站6号发电机定子电晕处理

大朝山水电站6号发电机定子电晕处理

鲁晓明

云南水力发电2024,Vol.40Issue(z1):77-79,3.
云南水力发电2024,Vol.40Issue(z1):77-79,3.DOI:10.3969/j.issn.1006-3951.2024.Z1.020

大朝山水电站6号发电机定子电晕处理

Corona Treatment of No.6 Generator Stator in Dachaoshan Hydropower Station

鲁晓明1

作者信息

  • 1. 国投云南大朝山水电有限公司,云南 临沧 677000
  • 折叠

摘要

Abstract

No.6 generator of Yunnan Dachaoshan Hydropower Station has been in operation for nearly 20 years and underwent A-level maintenance of the unit in February 2023.In the preventive test of the generator,a large number of corona points were found using ultraviolet equipment.The plan is to repair the stator corona during the maintenance period,improve the insulation level of the generator stator,and increase its service life.After treatment,the overall insulation level of the generator stator has been improved,effectively curbing the spread of corona and providing assurance for the safe and stable operation of the unit.

关键词

水轮发电机/定子绕组/电晕/修复

Key words

water turbine generator/stator winding/corona/repair

分类

建筑与水利

引用本文复制引用

鲁晓明..大朝山水电站6号发电机定子电晕处理[J].云南水力发电,2024,40(z1):77-79,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文