东北水利水电2024,Vol.42Issue(6):3-5,36,4.
大藤峡水利枢纽工程二期大江截流设计
Phase Ⅱ river cut-off design of Datengxia Water Conservancy Project
张新荣 1程振1
作者信息
- 1. 中水东北勘测设计研究有限责任公司,吉林长春 130021
- 折叠
摘要
Abstract
This paper describes the technical characteristics of the second phase of Datengxia Water Conservancy Project,analyzes the selection of cut-off time and cut-off standard,and proposes the scientific berm arrangement,access zone and throwing material particle size through the combination of theoretical calculation and model test,which can provide good reference for the closure design of similar projects in China.关键词
截流设计/戗堤布置/大藤峡水利枢纽Key words
cut-off design/berm arrangement/Datengxia Water Conservancy Project分类
水利科学引用本文复制引用
张新荣,程振..大藤峡水利枢纽工程二期大江截流设计[J].东北水利水电,2024,42(6):3-5,36,4.