| 注册
首页|期刊导航|广东水利水电|抽水蓄能电站侧式进/出水口内部流动规律研究

抽水蓄能电站侧式进/出水口内部流动规律研究

徐天浩

广东水利水电Issue(5):68-73,6.
广东水利水电Issue(5):68-73,6.

抽水蓄能电站侧式进/出水口内部流动规律研究

Study on Internal Flow Law of Side Inlet/Outlet of Pumped Storage Power Station

徐天浩1

作者信息

  • 1. 安徽省水利水电勘测设计研究总院股份有限公司,合肥 230088
  • 折叠

摘要

Abstract

In order to cope with the hydraulic problems caused by frequent changes of reservoir water level and bidirectional flow of water,the side inlet/outlet of pumped storage power station needs to ensure good internal hydraulic characteristics.Taking the side inlet/outlet of a pumped storage power station as an example,the numerical simulation method is used to analyze the flow pattern of each part and explore the internal flow law under the bidirectional flow condition.The results show that under the two conditions,the flow velocity changes along the middle hole and side hole are the same,and the diffusion section has the greatest influence on the flow velocity changes inside the inlet/outlet.Under the inlet condition,the main stream is located at the bottom of the orifice,and the backflow area is formed above the adjustment section due to the shear action of the two-direction flow.Under the discharge condition,the main stream is located in the middle of the orifite,and the vertical diffusion Angle causes the flow separation phenomenon above the diffusion section and the adjustment section.The research results can provide reference for the design of side inlet/outlet of the same type pumped storage power station.

关键词

抽水蓄能电站/侧式进/出水口/流速分布/数值模拟

Key words

pumped storage power station/side inlet/outlet/velocity distribution/numerical simulation

分类

建筑与水利

引用本文复制引用

徐天浩..抽水蓄能电站侧式进/出水口内部流动规律研究[J].广东水利水电,2024,(5):68-73,6.

广东水利水电

1008-0112

访问量0
|
下载量0
段落导航相关论文