| 注册
首页|期刊导航|江汉大学学报(自然科学版)|不同堵塞条件下硬岩隧道直眼掏槽破岩效果数值模拟研究

不同堵塞条件下硬岩隧道直眼掏槽破岩效果数值模拟研究

陈思佑 姚颖康 朱丹 孙金山 贾永胜

江汉大学学报(自然科学版)2024,Vol.52Issue(3):5-15,11.
江汉大学学报(自然科学版)2024,Vol.52Issue(3):5-15,11.DOI:10.16389/j.cnki.cn42-1737/n.2024.03.001

不同堵塞条件下硬岩隧道直眼掏槽破岩效果数值模拟研究

Numerical Simulation Study on Rock Breaking Effect of Burn Cut in Hard Rock Tunnel Under Different Blocking Conditions

陈思佑 1姚颖康 1朱丹 1孙金山 1贾永胜2

作者信息

  • 1. 江汉大学 省部共建精细爆破国家重点实验室,爆破工程湖北省重点实验室,湖北 武汉 430056
  • 2. 江汉大学 省部共建精细爆破国家重点实验室,爆破工程湖北省重点实验室,湖北 武汉 430056||武汉爆破有限公司,湖北 武汉 430056
  • 折叠

摘要

Abstract

In order to study the effect of different stemming materials and stemming lengths on the burn cut blasting of hard rock tunnels,based on engineering examples,a three-dimensional numerical model was established using ANSYS/LS-DYNA simulation software to compare and analyze five different blockage conditions.Based on the numerical model calculation results,qualitative analysis was conducted on the expansion of blasting cracks in the cutting area,and quantitative analysis was conducted on the stress situation of typical rock parts.The results indicate that,firstly,the free surface rock is mainly subjected to tensile stress to generate cracks,and the blockage of the blast hole prolongs the overall action time of the explosion load,resulting in a denser number of cracks on the free surface.Secondly,the surrounding rock near the air section between the explosive and the stemming material is first crushed by the explosive stress wave and then subjected to multiple transformations between tensile and compressive stresses,causing the crack to be amplified.Due to the "gas wedge" effect of the explosive gas,the crack almost penetrates the model cross-section.Thirdly,after the blockage of the blast hole,the stress value of the explosive gas acting on the rocks around the explosive section is significantly increased,which is 1.31-2.34 times higher than the peak stress of the rock around the explosive section when it is not blocked.The blockage of the blast hole increases the compressive stress value of the explosive gas when it continues to play a stable role by 3.70-4.70 times.Finally,when using gun mud and water as blockage materials,the rock-breaking effect of a burn cut with a stemming length of 40 cm is better than that of a burn cut with a stemming length of 60 cm.The research results can provide a theoretical basis for optimizing the parameters of burn-cut blasting in hard rock tunnels.

关键词

钻爆法/硬岩隧道/直眼掏槽/炮孔堵塞/数值模拟

Key words

drilling and blasting method/hard rock tunnel/burn cut/blast-hole stemming/numerical simulation

分类

矿业与冶金

引用本文复制引用

陈思佑,姚颖康,朱丹,孙金山,贾永胜..不同堵塞条件下硬岩隧道直眼掏槽破岩效果数值模拟研究[J].江汉大学学报(自然科学版),2024,52(3):5-15,11.

基金项目

湖北省重点研发计划项目(2021BAD004) (2021BAD004)

中国国家铁路集团有限公司科技研究开发计划项目(K2021G024) (K2021G024)