| 注册
首页|期刊导航|科技创新与应用|和田—若羌铁路"七带一体"综合防沙技术

和田—若羌铁路"七带一体"综合防沙技术

赵加海

科技创新与应用2024,Vol.14Issue(16):144-147,4.
科技创新与应用2024,Vol.14Issue(16):144-147,4.DOI:10.19981/j.CN23-1581/G3.2024.16.034

和田—若羌铁路"七带一体"综合防沙技术

赵加海1

作者信息

  • 1. 新疆铁道勘察设计院有限公司,乌鲁木齐 830011
  • 折叠

摘要

Abstract

Hetian-Ruoqiang Railway(He-Ruo Railway)is located in the southern edge of Taklimakan Desert,the second largest flowing desert in the world.Violent wind-blown sand activities pose a major threat to the operation safety of 409.19 km of the railway(50%of the total length).Therefore,wind-blown sand control becomes the key to the successful construction and safe operation of the railway.This paper firstly investigated and summarized the present situation of the hazard of wind-blown sand along He-Ruo Railway,and introduced the comprehensive sand prevention technology of"Seven-Belt Structure"which was explored and summarized in the process of railway construction.The proposed comprehensive technology has achieved the goal of avoiding the sand damage on the railway during the construction period.At present,the overall survival rate of the plants has reached more than 85%,and the plant spacing height is about 1.0~1.5 m,which will escort the safe operation of the railway.The relevant work and results can guide the design,construction and management of similar projects,and provide a basis for the national decision-making in project approval.

关键词

风沙危害/七带一体/综合防沙技术/雾喷固沙/和若铁路

Key words

wind-blown sand hazard/Seven-Belt Structure/comprehensive sand control technology/stabilize sand dunes by spraying/He-Ruo Railway

分类

交通工程

引用本文复制引用

赵加海..和田—若羌铁路"七带一体"综合防沙技术[J].科技创新与应用,2024,14(16):144-147,4.

基金项目

中国铁路乌鲁木齐局集团有限公司科技研究开发计划课题(WLMQ-KGHZGS-HRTL-GGB-2020-0031) (WLMQ-KGHZGS-HRTL-GGB-2020-0031)

国家自然科学基金资助项目(12302511) (12302511)

科技创新与应用

2095-2945

访问量0
|
下载量0
段落导航相关论文