科技创新与应用2024,Vol.14Issue(16):171-174,4.DOI:10.19981/j.CN23-1581/G3.2024.16.041
钢筋混凝土长距离顶管施工技术在市政给排水施工中的应用
林圣然1
作者信息
- 1. 沈阳市市政工程设计研究院有限公司,沈阳 110015
- 折叠
摘要
Abstract
This paper takes the sewage pipe network project of a city as an example to explore the application of reinforced concrete long-distance pipe jacking construction technology.Before construction,we should strengthen the inspection and acceptance of basic materials such as bentonite and reinforced concrete pipelines,as well as equipment such as cranes and soil pressure balancing pipe jacking machines,and lay out the work well and the receiving well.After the installation of the construction equipment on the surface and in the well,the reinforced concrete pipe is hoisted and the jacking operation begins.In the construction of long-distance pipe jacking,the pouring of thixotropic mud,the setting of relay station,the measurement and control and deviation correction of reinforced concrete pipe are all the key technical points that need to be paid attention to.Through the implementation of the whole process construction management,the construction quality is guaranteed and the construction task is completed smoothly.关键词
钢筋混凝土管/长距离顶管施工/中继站/触变泥浆/市政给排水Key words
reinforced concrete pipe/long-distance pipe jacking construction/relay station/thixotropic mud/municipal water supply and drainage分类
建筑与水利引用本文复制引用
林圣然..钢筋混凝土长距离顶管施工技术在市政给排水施工中的应用[J].科技创新与应用,2024,14(16):171-174,4.