热力透平2024,Vol.53Issue(2):93-96,112,5.DOI:10.13707/j.cnki.31-1922/th.2024.02.006
整体煤气化联合循环汽轮机三改联动改造方案
Three-Renovation Scheme for Steam Turbine in an Integrated Gas Combined Cycle Power Plant
王彪 1李胤祺1
作者信息
- 1. 上海汽轮机厂有限公司,上海 200240
- 折叠
摘要
Abstract
Coal is still the main fuel used in integrated gasification combined cycle(IGCC)power plant.To adapt to the requirements of"three-renovation"from the country and meet actual demand of customer,the study was conducted on renovations for steam turbine in an integrated gas combined cycle power plant from aspects of energy-saving,heating and operation flexibility.Comparison was carried out among different renovation schemes to analyze their technical paths and economic efficiency,and it was determined that the scheme of double-rotor and heating by recirculating water was the optimal one.This scheme consisted of flow path renovation during non-heating season and heating renovation of high backpressure circulating water during heating season.The performance indexes would be significantly improved by adopting this scheme:in turbine heat acceptance condition,the heat consumption in pure condensing condition would be reduced by about 5.15%,and the power output would be increased by about 8.4%;the heating supply would be about 186.67 MW.This scheme is of considerable economic and social benefit,and can provide reference for"three-renovation"of similar units.关键词
整体煤气化联合循环/三改联动/节能改造/循环水供热改造Key words
integrated gasification combined cycle/three-renovation/energy-saving renovation/heating renovation of recirculating water分类
信息技术与安全科学引用本文复制引用
王彪,李胤祺..整体煤气化联合循环汽轮机三改联动改造方案[J].热力透平,2024,53(2):93-96,112,5.