热力透平2024,Vol.53Issue(2):113-117,5.DOI:10.13707/j.cnki.31-1922/th.2024.02.010
全厂及汽轮机岛性能试验标准比对和实践研究
Comparison and Practice of Performance Test Standards for Entire Power Plant and Turbine Island
李麟 1张朋飞 2罗碧星 3陆梁1
作者信息
- 1. 上海电力建设启动调整试验所有限公司,上海 200031
- 2. 西安热工研究院有限公司,西安 710054
- 3. 上海电气电站设备有限公司汽轮机厂,上海 200240
- 折叠
摘要
Abstract
The performance test is considered as a crucial part of project acceptance of thermal power construction,thus the effectiveness and precision of its pre-planning and practice management play a vital role in contract management and successful handover of construction project of coal-fired power plant.Combined with the current practice in performance test at home and abroad,comparison was carried out between the national standard and ASME standard system respecting whole coal-fired power plant and turbine island.Based on practice of the two systems of performance test standard in engineering project,the main points that should paid attention to in technical agreement planning and on-site practice were concluded.The research results can provide guidance for pre-planning and management in overseas project of coal-fired power plant,and also can provide reference for standardization research on performance test.关键词
燃煤电站/性能验收试验/国标体系/ASME体系Key words
coal-fired power plant/performance acceptance test/national standard system/ASME standard system分类
能源科技引用本文复制引用
李麟,张朋飞,罗碧星,陆梁..全厂及汽轮机岛性能试验标准比对和实践研究[J].热力透平,2024,53(2):113-117,5.