世界有色金属Issue(6):88-91,4.
露天矿山地采测数字化闭环管理应用研究
Application Research on digital closed-loop management of ground mining Survey in Open-Pit Mine
逯登栋 1孟航晔 1乔玉财 1张青福 1李磊 1王金宏1
作者信息
- 1. 青海黄河矿业有限责任公司,青海 西宁 810016
- 折叠
摘要
Abstract
In the process of mine construction and development,the traditional mine geological survey management has a lot of problems,such as large management workload,low degree of information integration,prominent potential safety hazards,loss of mineral resources,unclear workflow and low efficiency.There is no systematic digital closed-loop management model of geological survey in China.Based on the"green wisdom"mine construction of the Xiarihamu nickel-cobalt mine and the application of open-pit mine digitization and information technology,this paper forms a set of open-pit mine digital closed-loop management model of fine measurement,data sharing,system approval,tracking and positioning,mechanical scheduling and real-time monitoring.The PDCA closed-loop management theory and the industry modern digital management method are applied to the Xiarihamu open-pit mining to practice the modern digital innovation management of open-pit mining geological survey.关键词
绿色矿山/智慧数字化/管理模式/露天矿山地采测/夏日哈木镍钴矿Key words
Green mine/Intelligent digitization/Management mode/Geological Mining survey of open-pit mine/Xiarihamu Ni-Co deposit分类
社会科学引用本文复制引用
逯登栋,孟航晔,乔玉财,张青福,李磊,王金宏..露天矿山地采测数字化闭环管理应用研究[J].世界有色金属,2024,(6):88-91,4.