北江"2024.4"与"2022.6"两场特大洪水比较分析OA
A comparative analysis of two catastrophic floods of Beijiang River Basin in April 2024 and June 2022
2024年4月16-23日,珠江流域发生入汛后最强降雨过程.受其影响,北江干支流水位全线上涨,其中北江发生超100年一遇特大洪水,这是北江流域自"2022.6"特大洪水后,发生的又一场特大洪水.以实测资料为依据,从暴雨成因、暴雨分布、暴雨特点、洪水量级、洪水组成、洪水特点等方面对"2024.4"与"2022.6"两场特大洪水作详细分析比较,并总结两场洪水过程中北江水工程联合调度效果,以期为未来抵御北江流域特大洪水提供经验参考.
From April 16 to 23,2024,the Pearl River experienced the strongest rainfall process since the flood season this year.Affected by the heavy rainfall,the water level of the main and tributaries of the Beijiang River has risen,The Beijiang River experienced an over-100-year catastrophic flood,which is another major flood that has occurred in the Beijiang River Basin since the catastrophic flood in June 2022.Based on the measured data,this paper makes a detailed analysis and comparison of the catastrophic floods in April 2024 and June 2022 from the aspects of rainstorm cause,rainstorm distribution,rainstorm characteristics,flood magnitude,flood composition and flood characteristics,etc.,summarizes and compares the joint operation effect of Beijiang water projects in the course of the two floods,aiming to offer an empirical reference for the defense against the future catastrophic floods in the Beijiang River Basin.
蓝羽栖;陈学秋;张文明
水利部珠江水利委员会水文局,广州 510611
水利科学
暴雨洪水分析北江流域特大洪水联合调度
rainstorm flood analysisBeijiang River Basincatastrophic floodjoint scheduling
《中国防汛抗旱》 2024 (006)
8-12 / 5
水利部重大科技项目(SKR-2022038).
评论