城市建筑2024,Vol.21Issue(10):209-212,4.DOI:10.19892/j.cnki.csjz.2024.10.49
大断面盾构内部弧形件拼装和填充层质量控制要点分析
Analysis on the Assembly Process for the Internal Arc Components of Large-Section Shield Tunneling and Key Quality Control Points for the Filling Layer
摘要
Abstract
This paper briefly introduces the current status and development of the assembly process for the internal structure of large-section shield tunneling.Based on engineering cases,the assembly process for the arc components of large-section shield and the key quality control points for the filling layer are analyzed,and a filling rate calculation method is developed.The filling quality is controlled from two aspects of the expansion degree of self-compacting concrete and the filling rate to ensure the compactness and fullness of the filling.This method can be used as a reference for the application of large-section shield arc component assembly process in similar projects.关键词
大断面盾构/弧形件/填充层/控制要点Key words
large-section shield tunneling/arc components/filling layer/key control points分类
交通工程引用本文复制引用
孙先祥,李磊,贾元迪..大断面盾构内部弧形件拼装和填充层质量控制要点分析[J].城市建筑,2024,21(10):209-212,4.基金项目
上海建科工程咨询有限公司科研创新项目(KY10000249.20220019) (KY10000249.20220019)