净水技术2024,Vol.43Issue(z1):380-385,6.DOI:10.15890/j.cnki.jsjs.2024.s1.055
上海N水厂不停产深度处理改造及调试实施
Reconstruction and Commissioning of Non-Stop Advanced Treatment in Shanghai N WTP
姚晴晴1
作者信息
- 1. 上海浦东水务<集团>有限公司,上海 201399
- 折叠
摘要
Abstract
The design scale of the advanced treatment project of Shanghai N WTP is 440 000 m3/d.O3-BAC advanced treatment process is adopted.Considering the process characteristics and in conjunction with the engineering construction and operational conditions of the WTP,a non-stop deep treatment engineering renovation is implemented.During the construction and commissioning stage of the deep treatment transformation project,Shanghai N WTP effectively solve the engineering difficulties such as the protection of the original water discharge pipe and the collision and connection of new and old pipelines.It also formulates the plans for single machine commissioning,linkage commissioning and full load commissioning.In the implementation process,through strengthening the washing of structures and pipelines,adding CO2 to regulate the pH of backwashing water of carbon filter,it ensures the connection between the deep treatment transformation project and the existing production system,and solves the problem of noise reduction of drainage valves.After commissioning,all indices of the water leaving the factory have fully met the requirements of Standard for Drinking Water Quality(GB 5749-2022)and local water quality standards in this region.关键词
深度处理/改造工程调试/O3-BAC/炭滤池冲洗/排空阀降噪Key words
advanced treatment/engineering debugging/O3-BAC/carbon filter flushing/exhaust valve noise reduction分类
建筑与水利引用本文复制引用
姚晴晴..上海N水厂不停产深度处理改造及调试实施[J].净水技术,2024,43(z1):380-385,6.