净水技术2024,Vol.43Issue(z1):128-134,7.DOI:10.15890/j.cnki.jsjs.2024.s1.019
基于复杂系统管理思维的污水处理厂洪灾恢复案例分析
Case Analysis of a WWTP Recovering after Flood Based on Complex System Management Thinking
李红博 1李鹏 1张强 2姚亮 2张赛 2杨喆程 2李刚 2张海龙2
作者信息
- 1. 北京恩菲环保股份有限公司,北京 100038||北京恩菲环保技术有限公司,北京 100038
- 2. 北京恩菲环保股份有限公司,北京 100038
- 折叠
摘要
Abstract
In view of the complex characteristics of wastewater treatment plant(WWTP)recovering after flood which goes beyond conventional engineering construction,an analysis method based on complex system management thinking is proposed.Taking the WWTP recovering after flood in Hebei Province as a case,this paper analyzes the complexity of engineering and systems,and uses correlation cutting method and target applicability thinking to degrade the difficulty of the problem.The WWTP recovering after flood engineering is divided into two stages:functional recovery and normalized operation.The relatively weak correlation of each element is cut to reduce and decompose the inherent complexity of the engineering,and the expected goal of the WWTP recovering after flood are achieved.The complex engineering analysis method based on complex system management thinking in the paper can provide reference and inspiration for similar projects in the future.关键词
复杂系统管理/污水处理厂/洪灾恢复/MBR系统/调试及运行Key words
complex system management/wastewater treatment plant(WWTP)/recovering after flood/MBR system/commissioning and operation分类
建筑与水利引用本文复制引用
李红博,李鹏,张强,姚亮,张赛,杨喆程,李刚,张海龙..基于复杂系统管理思维的污水处理厂洪灾恢复案例分析[J].净水技术,2024,43(z1):128-134,7.