摘要
Abstract
This study investigates a novel vertical belt concrete pour(BCP)protection technique,using a residential project's basement as a case study.The technique employs a prefabricated reinforced steel plate formwork for vertical BCP protection,welding steel plates and steel channels to form the main frame and using steel plates as protective panels.Addressing issues such as long construction periods,high costs,and unstable quality associated with traditional methods,the proposed technique offers advantages of shorter construction periods,lower costs,and stable construction quality.Practical application demonstrates promising prospects and promotional value for this technique in vertical BCP protection for basements.关键词
地下室/后浇带防护/钢板式模板/施工周期/成本/施工质量Key words
Basement/Belt Concrete Pour(BCP)Protection/Steel plate formwork/Construction period/Cost/Construction quality分类
建筑与水利