|国家科技期刊平台
首页|期刊导航|城市建筑|某悬浇桥施工临时墩受力分析

某悬浇桥施工临时墩受力分析OA

Analysis on the Stress on Temporary Piles for a Suspended Casting Bridge During Construction

中文摘要英文摘要

大跨径连续梁桥基本采用悬臂浇筑施工,为减小施工期间主墩受力,加强结构的稳定,往往在主墩和 0 号块处设置临时墩.临时墩受力情况复杂,按照传统的计算方法,难以对施工临时墩的受力进行精确分析.为精确计算施工期间临时墩的受力,文章采用大型有限元程序,对施工过程各工况进行模拟,计算各工况下临时墩的位移和应力.经分析表明,随着施工工况的变化,临时墩受力变化较大,需对施工全过程进行模拟,方可计算临时墩最大的受力位移和应力,保证临时墩的安全.

Long span continuous beam bridges are generally constructed with cantilever pouring.In order to reduce the stress on the main pier during construction and to enhance structural stability,temporary piers are often installed at the main pier and block 0.The stress situation of temporary piers is complex,and according to traditional calculation methods,it is difficult to accurately analyze the stress of temporary piers during construction.To accurately calculate the stress on temporary piers during construction,this paper uses a large finite element program to simulate various working conditions during the construction process,and to calculate the displacement and stress of temporary piers under each working condition.After analysis,it has been shown that with the changes in construction conditions,the stress on temporary piers varies significantly.It is necessary to simulate the entire construction process to calculate the maximum displacement and stress on temporary piers and to ensure their safety.

王静

山西省交通规划勘察设计院有限公司

交通运输

悬臂浇筑临时固结临时墩

cantilever pouringtemporary consolidationtemporary pier

《城市建筑》 2024 (012)

225-228 / 4

10.19892/j.cnki.csjz.2024.12.55

评论